Posts

Showing posts from August, 2019
Moved new blog content to kneewall49.tumblr.com
Image
August 5th 2019 Since last we are putting the finishing touches on preparations to move the caravan this coming weekend.  So we have: Moved the Water Tanks: - This entailed prepping the site and foundations of one tank only, we don't need both tanks working at present; - Moving the tanks from their prominent and temporary position right in the middle of the block; that was fun :) - Getting one tank filled with carted water; - Setting up one pump and associated plumbing to get this water to the van site. - We also moved the smaller tank we bought much earlier to a position which will accept direct water run-off from the (to be constructed) roof of the container which itself still needs to be moved); Big bugger !  BTW we did find the outlet :) Motoko works Mr Mitarai, together with girl sound effects. All nicely in place for the time being. Set up a Portable Loo: - Ordered and had positioned a port-a-loo to save the undignified trip to the local ...